Progress on the AP bottling plant project in Mokrá.

We have reached another milestone in our project and the filling station for liquid alternative fuels (AF) is one step closer to full operation. What have we achieved?

  • The installation of the second shell of the storage tank was completed, including the heating pipes inside the storage tank, which will be used to heat the heating fuel.
  • The hydrostatic test of the storage tank was successfully completed.
  • Installation of the pipework for direct filling of the AP liquid into the rotary kilns was completed.
  • A steam generator system was installed to heat the fuel oil in the car.
  • First successful filling of liquid AP into the rotary kiln - a key moment in the commissioning of the kiln line!

This new technology reduces CO2 emissions and makes fuel unloading more efficient, all contributing to more efficient production.